Testimonials
“Over the last 4 years we have successfully completed more than a dozen schemes with OFP ranging from 2 to 50 units in size. In my dealings with OFP Ltd it is very clear that they have a passion for their business that emanates from the very top of the Company.
The early involvement of OFP at design stage has proved beneficial to us in value engineering projects and their use of materials from sustainable sources complements our own ethos on sustainability.
Their manufacture, delivery of materials and site works are invariably on time and any problems (that inevitably arise) are dealt with swiftly and with a minimum of fuss.
I therefore have no hesitation in recommending OFP Ltd to design, supply and erect timber framed construction.”
Keith Beavers
Building Manager, CROUDACE HOMES IN PARTNERSHIP LIMITED
“We are currently working on our fourth project with OFP and have every intention on working on new schemes with them.
Their professionalism from design stage right through to construction on site is always highly commendable.
Close co-operation with their friendly hands on staff have ensured that all projects have been completed on time, to specification and within budget.
Innovation and keeping ahead of the times when it comes to design and manufacturing, and a firm understanding of the need to use materials from managed resources help keep OFP at the forefront of timber frame manufacturers.
We look forward to working with OFP in the future.”
Rob Young
Director, D.J Ellis Construction Limited
“OFP have now worked with us on three projects over the last two and a half years, winning the first competitively and the remainder weighted more on previous performance. All projects were one off designs requiring certain flair to construct.
Timber frame as a method of construction meets our requirements for sustainability in the current drive to reduce carbon emissions.
Whilst OFP met this criteria, they went further in saving time, money and indeed energy being involved from the design stage with our architects ensuring every possible problem in the construction had been overcome prior to manufacture and erection.
We found the company to be very proactive in respect to both design and programming prior to any works commencing.
The construction stage was met with the same professionalism, in the event of any problem it was dealt with expediently.
It became a team effort from the design and carried through after the first day the erection team arrived on site, led I am sure from the top management of the company.
In closing we would have no problem recommending OFP for any timber frame project in the future.”
Trevor Mclellan
Walker Quality Homes





